Two tables are included which identify the common terminology used for Earned Schedule (ES). Table 1 indicates the accepted EVM terminology for cost and then displays, comparatively, the ES terminology for an analogous measure or indicator.

EVM and ES terminology

Table 1

The second table breaks down the ES terminology to measures, indicators, and predictors. The terminology depicted in this table has a few terms requiring definition:

PD = Planned Duration
ED = Estimated Duration
PF(t) = Performance Factor (time-based)

The time-based performance factor is analogous to the PF used in the EVM IEAC equation.

Table 2

 
Introductory Video
Concept Description
ES Terminology
ES Enhances EVM
EVM Time Forecasting
Contacts
Training Sources
Sites of Interest
EVM - ES Tools
ES Book
ES Book (Translations)
ES Awards
Copyrights & Trademarks
PCA Interview
PC Podcast
 
SSL site seal - click to verify